Element 14.15: Arc Flash and SWP 1.13: Arc Flash have been updated to include changes resulting from the implementation of a new arc flash survey methodology. Arc flash PPE is now selected based on the incident energy level of the apparatus and the minimum arc rating of the required PPE. Workers must refer to the arc flash label for the incident energy level and Table 1 of SWP 1.13: Arc Flash for the required PPE.
News
The second annual Campground Christmas in Hay River was held over the first weekend of December. Thanks to the efforts of our volunteers, NTPC was once again well-represented.
Thank you to all who spent hours in the cold putting together the display.
The December 2021 edition of the all-Canadian Health, Wellness, and Safety Newsletter is here! Inside this month’s issue you'll find articles on preparing your vehicle for winter, signs of hypothermia and frostbite, cyber security during the holidays, lighting and electricity safety, and much more. Have a read!
The 2021/22 Q2 Health & Safety Statistics Report is available here. It has lots of great information on incidents, injuries, and concern reports - check it out!
Section 8.9 of SWP 1.32: COVID-19 Prevention & Control has been updated to include a new form and process for contractors requesting an exception to the vaccination requirement. Form 1.32.1: Contractor Vaccination Exception is now available on PowerLine.
All NTPC employees and contractors are required to abide by the current versions of these documents, found on PowerLine. Please review the documents that pertain to your field of duties.