SJP 3.302 Changing a Fuse on a Power Distribution System - Plant Superintendents and Plant Operators
Published:
Published:
Procedure for the installation of service drops including duplex, triplex, quadruplex, or open wire services.
Published:
Current to January 2018
Published:
Current to 2018
Published:
Procedure for the removal of brush and trees from transmission line rights of way.
Use SJP 3.001.1 Form - Danger Tree Identification and Removal to document danger trees.
Published:
Form used to document danger trees for removal.
This form is to be used as outlined in SJP 3.001 - Transmission Line Clearing.
Published:
Procedure for the safe removal of fallen trees from power lines.