A Safe Job Procedure is a documented set of specific steps required to carry out a job safely and efficiently.
1.000 |
General |
||
|
|
1.100 |
IT Equipment |
|
|
|
1.101 |
Racking and Unracking IT Equipment |
|
1.200 |
Storage Tanks |
||
1.201 |
Cleaning Potable Water Storage Tanks |
||
2.000 |
Plant |
||
|
|
2.100 |
Generating Unit |
|
|
|
2.101 |
Installing Grounds on 5 kV Generators & Feeders |
|
2.200 |
Main Machine Set (Diesel) |
||
|
|
2.201 |
Responding to an LNG Release |
|
2.300 |
Controls and Protection |
||
|
|
2.301 |
System Automation & Protection Work Conducted on Operating Plant Equipment |
|
|
|
2.302 |
Racking a Circuit Breaker - General |
|
2.400 |
Ancillary System (Cranes, Lifts, Service Equipment, etc.) |
||
3.000 |
T&D |
||
|
|
3.100 |
General |
|
|
|
3.101 |
De-energizing an Underground Cable |
|
3.200 |
Customer Service |
||
|
|
3.201 |
Meter Removal and Installation |
|
3.300 |
Distribution (Structures and Maintenance) |
||
|
|
3.301 |
Replacing Wood Poles on De-energized Lines |
|
3.302 |
Changing a Fuse on a Power Distribution System - Plant Superintendents and Plant Operators |
||
3.400 |
Overhead Conductors, Insulators, Transformers, etc. |
||
3.401 |
Electrical Service Installation - Overhead |
||
3.402 |
Ice Removal from Power Line Structures and Conductors |
||
|
|
3.403 |
Preparing Transformers with Four Secondary Bushings External Connections for 120/208 V Three Phase Bank |
|
|
|
3.404 |
Preparing Transformer with Three Secondary Bushings Internal Connections for 120/208 V Installation |
|
3.500 |
Right-Of-Way (Brushing, Clearing, Danger Trees, etc.) |
||
3.501 |
Transmission Line Clearing
|
||
|
|
3.502 |
Tree Removal from Power Lines |
|
|
|
3.503 |
Distribution Line Clearing |
|
3.600 |
Transmission (Towers and Fixtures) |
||
3.700 |
Substation |
||