In the event of an incident and anticipated emergency Form 11.4: Emergency Declaration Guidelines shall be followed to determine the level of emergency.  It covers the following:

  • Notification of Incident
  • Emergency Declaration and Response
  • Emergency Cancellation
  • Lessons Learned
  • Debrief
Published:

A set of documented procedures to prepare for a pandemic emergency with measures for prevention, preparedness, response, and recovery.

Published:

A form used to document emergency evacuation drills.  

Published:

Complete listing of NTPC health & safety records.

Published:

Updated quarterly.  Includes: 

  • Summary of Incident Reports.
  • Summary of Concern Reports.
  • Injury statistics (type, frequency, severity).

 

Published:

All acts, regulations, codes of practice, and CSA standards that apply to NTPC operations are listed here.  

Published:

Used to:

  • Determine the project safety needs.
  • Assign Principal Contractor (party responsible for project safety) – either NTPC or the contractor.
  • Identify key activities, hazards, controls.
Published:

Plan of action to prevent incidents on major projects.  Details health & safety systems/requirements for project.  Reviewed with all workers and kept onsite.  Required when:

  • Project work costs are greater than $250,000 (excluding material costs);
  • More than one contractor will be on site;
  • Project duration is expected to be longer than 15 days;
  • Prolonged high risk activities; and/or
  • As otherwise directed by the Health & Safety Department.

 

Published:

Tool formerly used by the Health & Safety Department to review and assess Project Safety Plans.  This form was archived in 2017 and is no longer used.  Comments and recommendations for Projects Safety Plans are now made directly on the Project Safety Plan forms.

Published:

Used to evaluate the overall safety performance of the project.