Current to October 2017
Document Manager
Published:
Published:
Procedure for the temporary grounding of underground equipment and de-energizing of underground cables.
Published:
Procedure for the safe installation and removal of revenue meters.
SJP 3.302 Changing a Fuse on a Power Distribution System - Plant Superintendents and Plant Operators
Published:
Current to Sept 2018
Published:
Procedure for the installation of service drops including duplex, triplex, quadruplex, or open wire services.
Published:
Current to January 2018
Published:
Current to 2018
Published:
Procedure for the removal of brush and trees from transmission line rights of way.
Use SJP 3.001.1 Form - Danger Tree Identification and Removal to document danger trees.