Follow the NTPC Contractor Discipline Policy if and when Safe Work Practices and/or Safe Job Procedures are not being followed and/or hazards are not adequately controlled.  Use this form e to draft the letter in consultation with the Health & Safety Department.

Published:

A Work Permit is a guarantee of isolation for specific work on specific apparatus.

Published:

To be used to document Work Protection Code training.  

Published:

The Local Issuing Authority shall obtain permission from the System Issuing Authority prior to issuing permits on apparatus connected to the Electrical System (i.e., Yellowknife/Bluefish/Snare system and the Fort Smith/Taltson system).  This form shall be completed and submitted to the System Issuing Authority.

Published:

The Issuing Authority shall record the first permit transfer in the Transfer section of the permit, and any additional permit transfers on this form. 

Published:

An Equipment Access Permit is authorization from the Issuing Authority to conduct work on apparatus where no isolation permitting is required.

Published:

For use when Testing Under a Work Permit (see section 10 of the Work Protection Code). 

Published:

A Work & Test Permit is a guarantee of de-energization when issued under which specific work and tests are done on specific apparatus.

Published:

A Hold-Off Permit is a guarantee of non-reclose for work on or near dynamically alive apparatus.

Published:

Switching Plans shall be used in conjunction with Work Protection permits to ensure worker safety, equipment safety, and system security.

A Switching Plan shall be in place for every permit. 

All locks and tags shall be documented on the Switching Plan.