Plan of action to prevent incidents on major projects.  Details health & safety systems/requirements for project.  Reviewed with all workers and kept onsite.  Required when:

  • Project work costs are greater than $250,000 (excluding material costs);
  • More than one contractor will be on site;
  • Project duration is expected to be longer than 15 days;
  • Prolonged high risk activities; and/or
  • As otherwise directed by the Health & Safety Department.

 

Published:

Tool formerly used by the Health & Safety Department to review and assess Project Safety Plans.  This form was archived in 2017 and is no longer used.  Comments and recommendations for Projects Safety Plans are now made directly on the Project Safety Plan forms.

Published:

Used to evaluate the overall safety performance of the project.

Published:

Conducted to assess the implementation of the Project Safety Plan.  This form was archived in 2016 and is no longer used.

Published:

List of safety requirements contractors must follow.  

Published:

Used to conduct an inspection of the contractor at the worksite prior to project work beginning.  Helps to ensure that the contractor is carrying out their safety commitments as promised.  

Published:

Completed by the contractor.  Assists in tracking and reviewing contractor performance and in identifying areas requiring corrective action.

Published:

Follow the NTPC Contractor Discipline Policy if and when Safe Work Practices and/or Safe Job Procedures are not being followed and/or hazards are not adequately controlled.  Use this form e to draft the letter in consultation with the Health & Safety Department.

Published:

A Work Permit is a guarantee of isolation for specific work on specific apparatus.

Published:

To be used to document Work Protection Code training.